Skip to content
Monument · Spoleto

Ponte delle Torri

Spoleto

For centuries, Spoleto's Ponte delle Torri carried both people and water across the Tessino gorge. About 230 metres long and 80 metres high, its limestone piers and arches join the Rocca Albornoziana on Colle Sant'Elia to the slopes of Monteluco. The bridge reopened in 2024 after restoration following its closure in 2016.

Why it matters

The bridge links Spoleto's defence, water supply and landscape. Nine massive pillars of local limestone carry ogival arches across the Tessino, joining the Rocca Albornoziana to Monteluco. For centuries the structure also served as an aqueduct, carrying water from the Cortaccione springs into the town. Its silhouette remains a defining feature of Spoleto's cityscape.

What to notice

The deck lies above the water channel that once ran along the bridge. Two of the tallest pillars are hollow and built like towers; they may have served as guard posts where the medieval customs walls passed. The piers towards Monteluco grow more massive and are braced by mid-height arches, reflecting separate phases of construction. Some arches demolished in 1390 were rebuilt in masonry in 1639; two others were remade in brick in 1845. At the Monteluco end stands the Fortilizio dei Mulini, a fortified tower whose mills once ground grain using the same water before it continued towards the town.

Context and history

The foundations of the central pillars may belong to an earlier Roman structure. The present bridge is generally dated between the thirteenth and fourteenth centuries and took its current form in the mid-fourteenth century during Cardinal Albornoz's building programme. Its design is attributed to Matteo Gattapone, also associated with the Rocca. The dual role of the bridge explains its engineering: it carried people and supplies between the fortress and mountain, while also bringing spring water into the city. After the August 2016 earthquake, authorities closed the bridge as a precaution. Consolidation and restoration followed, including renewal of the water pipes beneath the walkway. It reopened in December 2024.